Premier Inn Hotel, London

Contract: JCT 2001(D&B) value: £6.5M Duration: 72 wks

Design and construction of a six storey, 95 bedroom hotel for Premier Inn. City centre development in North London. Piled basement RC frame to first floor podium deck, lightweight metal frame (Metsec) for the main structure with composite concrete floors. Curtain wall to ground floor and upper floor floors. Facades consist of insulated render system. Building topped with green roof. BREEAM (2011) Very Good building and EPC A grade achieved.